Author Archives: laraoftwinlakes

About laraoftwinlakes

Community leader

AUTOMATIC LAKE & SPILLWAY LEVEL MONITORING NEEDED

After almost 10 years of study and resident comments from all sides the Twin Lakes Protection and Rehabilitation District¬†has a new SPILLWAY. Water from Lake Elizabeth travels almost one mile from the Lake Elizabeth Marina Marker to the spillway. ¬†About … Continue reading

Posted in Uncategorized | Leave a comment

LARA 2010 Annual Meeting Completed

PLEASE COMMENT TO SUBSCRIBE or if you think the lake district should try to maintain the lake level about six to eight inches higher (at 794.0 to 794.3) than Sept 20th levels which we estimate at about 793.5 feet above sea level. Continue reading

Posted in Annual Meeting!, Lake Levels | 2 Comments

Dam Study Not Final

Hey Associates did not complete their study. Dam repairs are needed. Lake Steering Council to make recommendations.

Posted in Uncategorized | Tagged | Leave a comment

LARA 2010 Annual Meeting – Sept 11, 2010 @ 8:00pm Niko’s

SUbscribe by checking the box below! If you cannot attend please provide the LARA Board Your PROXY by Sending a COMMENT that includes your name in the space below or send an EMail to LARAofTL@Aol.com Continue reading

Posted in Annual Meeting!, Uncategorized | 2 Comments

SIGN UP TO RECEIVE PERIODIC POSTS ABOUT TWIN LAKES

SIGN-UP NOW Continue reading

Posted in Uncategorized | 1 Comment

Hello world!

Welcome to LARAofTwinLakes.WordPress.com. This is our first post.

Posted in Uncategorized | 1 Comment